September also saw Algar Air carrying out a major electrical works for our Customer who manufactures Bespoke Doors and Screens;
- We replaced the old double light fittings in 2 of their workshops and fitted 32 extra lights including Trunking, Cable and associated Fittings.
- We also installed 6 off power points above main centre doors on both sides for their CCTV cameras, running 2.5mm, 3 core, SWA Cable back to the Fuse Boards and installed CCTV Cameras.
- Cleaned and replaced low bay lamps where required in all Units/Workshops.