We are proud to be working with a local NHS unit to assist with the design and installation of a new orthotics manufacturing room.

NHS logo

Working closely with the specialist specifications of the NHS we produced a proposal designing and building a 6 Station Vacuum Rig with Isolation Valves & Drain Legs complete with the Vacuum Pump and Filtration.